STOUFFVILLE

Street Closures

Occasionally highways, roads and neighborhood streets are closed for events, construction or other reasons.  Notices of these closures will be posted on this page.

Roads can be closed by either Stouffville, York Region or the Province of Ontario.

May 3 - September 30: Burkholder Street

Burkholder Street, between Park Drive and Franklin Street will be closed every weekend. The closure will be in effect every Friday from 3:30 p.m. to Monday 8 a.m. (Tuesday of a long weekend). 

map of burkholder closure

July 19 - July 29: Woodbine Avenue - York Region

York Region will be doing construction on Woodbine Avenue north of St. John's Sideroad to replace a culvert July through August. Construction will take place Monday to Sunday, 7 a.m. to 7 p.m. The road will remain open to through traffic; however, lane closures will be required. Access to homes and businesses will be maintained. 

Closure July 19 - July 29

Woodbine Avenue from St. John’s Sideroad to Vivian Road will be closed from 7 p.m. on Friday, July 19 to 7 p.m. on Monday, July 29 to replace the culvert. Traffic will not be able to travel through the work zone during the road closure. Local traffic is permitted; however, those with properties to the north of the culvert can only access Woodbine Avenue from Vivian Road and those to the south, only from St. John’s Sideroad

If you have any questions about this project, please contact: shu.zhu@york.ca or call 1-877-464-9675 ext. 75295. For after-hours emergencies, please contact York Region’s Roads and Traffic Operations Centre at 1-877-464-9675 ext. 75200. For general inquiries, please contact Transportation Operations at 1-877-464-9675 ext. 75000 or via email at transportation@york.ca

Map of Woodbine Avenue Closure

May - July: Ninth Line - York Region

York Region will be doing construction on Ninth Line, from Donald Cousens Parkway to north of Main Street, for concrete repairs and microsurfacing. Construction will take place Monday to Friday, 9 a.m. to 7 p.m. The road will remain open to through traffic; however, lane closures will be required. Access to homes and businesses may be temporarily disrupted. 

If you have any questions about this project, please contact: colin.wong@york.ca or call 1-877-464-9675 ext. 76119. For after-hours emergencies, please contact York Region’s Roads and Traffic Operations Centre at 1-877-464-9675 ext. 75200. For general inquiries, please contact Transportation Operations at 1-877-464-9675 ext. 75000 or via email at transportation@york.ca

map of ninth line closure

June - July: Bloomington Road and Stouffville Road - York Region

York Region will be doing construction on Bloomington Road to Kennedy Road to Highway 24 and Stouffville Road from Highway 404 to Woodbine Avenue, for steel beam guide rail improvements.  Construction will take place Monday to Friday, 9 a.m. to 7 p.m. The road will remain open to through traffic; however, lane closures will be required. Access to homes and businesses will be maintained. 

If you have any questions about this project, please contact: richard.so@york.ca or call 1-877-464-9675 ext. 75263. For after-hours emergencies, please contact York Region’s Roads and Traffic Operations Centre at 1-877-464-9675 ext. 75200. For general inquiries, please contact Transportation Operations at 1-877-464-9675 ext. 75000 or via email at transportation@york.ca

map for road closures on Bloomington Road and Stouffville Road

June - August: Warden Avenue - York Region

York Region will be doing construction on Warden Avenue, from Elgin Mills Road to south of Stouffville Road, and from Bloomington Road to Vivian Road for microsurfacing road preservation. Construction will take place Monday to Friday, 9 a.m. to 7 p.m. The road will remain open to through traffic; however, lane closures will be required. Access to homes and businesses may be temporarily disrupted. 

If you have any questions about this project, please contact: colin.wong@york.ca or call 1-877-464-9675 ext. 76119. For after-hours emergencies, please contact York Region’s Roads and Traffic Operations Centre at 1-877-464-9675 ext. 75200. For general inquiries, please contact Transportation Operations at 1-877-464-9675 ext. 75000 or via email at transportation@york.ca

map of warden avenue street closure

June 29: Main Street

Main Street (from O'Brien Avenue to Park Drive) will be closed for an event on Saturday, June 29, 8 a.m. to 2 p.m.

July 1 - 2: Park Drive

Park Drive, from Burkholder Street to the Leisure Centre Driveway (2 Park Drive) will be closed Monday, July 1, 6 a.m. through  Tuesday, July 2, 12 p.m. for Canada Day Fireworks

July 1 - 2: Burkholder Street

Burkholder Street, from Park Drive to the Leisure Centre Driveway (2 Park Drive) will be closed Monday, July 1, 6 a.m. through  Tuesday, July 2, 12 p.m. for Canada Day Fireworks

Burkholder Street, between Park Drive and the Leisure Centre Driveway (2 Park Drive) will be closed every weekend.  The closure will be in effect every Friday from 3:30 p.m. to Monday 8 a.m. (Tuesday of a long weekend).

July 19: Burkholder Street

Burkholder Street, from Park Drive to the Franklin Street will be closed Friday, July 19, 12 p.m. through 10 p.m. for Symphony Under the Stars.

Burkholder Street, between Park Drive and Franklin Street will be closed every weekend.  The closure will be in effect every Friday from 3:30 p.m. to Monday 8 a.m. (Tuesday of a long weekend). 

July 26 - 27: Burkholder Street

Burkholder Street, from Park Drive to Franklin Street will be closed Saturday, June 8, 7 a.m. through 7 p.m. for Movies in the Park

Burkholder Street, between Park Drive and Franklin Street will be closed every weekend.  The closure will be in effect every Friday from 3:30 p.m. to Monday 8 a.m. (Tuesday of a long weekend). 

© 2024 Town of Whitchurch-Stouffville  | Privacy and Disclaimer

Scroll to top